PROJECT FACTS

Data Capture and Information Analysis

A paste extract soil test determined the soil was deficient in organic matter and highly alkaline (high pH).  The soil substrate must be amended to support sustainable vegetation.  An adequate supply of healthy topsoil to achieve a 24” buffer was not available or able to be imported.

Engineering Application Alignment

The prescriptive application would include incorporating 4”-6” of topsoil that would be dosed with an acid to balance the pH, a Biotic Soil Media (BSM) to increase microbial activity and organic matter.  The local conservation district recommended the specific variety of seeds that would handle the alkaline soil & thrive in the region.  The area was stabilized with a high-performance flexible growth medium (FGM) to control erosion and hold moisture through the germination period.

Customized Task Planning

Our team precisely followed the manufacturer’s application rates and calibrated all materials in a sequence to complete the project in one day.

Knowledge/ Driven Work Modules

Working the custom solution into our work module, our team was able to complete the project on time.  The scientific, agronomic approach successfully yielded sustainable vegetation to restore the slope and discharge clean, recharged stormwater off the pile.

TECHNICAL SPECS

The project utilized key technologies that include:

  • Soil Testing (paste extract)
  • 4”- 6” Topsoil in lieu of 24”
  • Aqua-pHix – 10 Gallons per acre
  • 3500# Biotic Soil Media
  • Custom Seed mix (Turf/Native)
  • 3000# of Flexible Growth Medium

Click here to contact one of our containment subject matter experts with any questions or to schedule a next steps call with one of our client support team professionals.


Corporate Office
5201 W. 86th St.
Indianapolis, IN 46268
317-429-3340

To learn more about our restoration & environmental solutions, contact us at: 
info@gwinnupsrestoration.com

For employment opportunities, contact us at:
jobs@@gwinnupsrestoration.com

Follow us to keep track of best practices, innovation and our environmental stewardship:

@gwinnupROW
@gwinnupcares

About Us

Gwinnup Restoration leads the industry in achieving successful Notices of Termination on-time, on-budget and without incident through our innovative approach to site engineering and remediation as well as our focus on safety.

Gwinnup has invested heavily in state-of-the-art equipment and the development of  experienced teams. We recognize it isn't just about getting to the Notice of Termination safely and successfully, but also about making sure the assets we engineer and construct stand the test of time.

© Gwinnup Restoration
crossmenu